How to build truss construction?

Browse:2127   Date:2020-07-06  

The aluminum alloy tube truss should be used together with the base, sleeve, top, hoist and other truss systems and accessories. First, make sure the tower systems are erected, and then the beam is assembled and connected under it. Finally, the beam is hoisted by the hoist and various lighting and sound equipment are hung on it.

      Methods and steps for construction:

      1、Position the four bases roughly on the ground and adjust the lower legs so that they are in a horizontal plane

      2、Insert the corner brace on the outside of the base at the four corners. Insert 2 corner brace at each corner, a total of 8 corner braces.

      3、Fix the Hinge on the first one Meter truss of base with steel pin. Make sure that the direction of rotation of the hinge is consistent with that indicated in the figure

      4、put the sleeve after assembled Hinge;

      5、Connect the beams on the ground;

      6、Connect the two ends of the beam to sleeves on both sides after the beam is assembled on the ground.

      7、the tower systems lying flat with hinge, Assembling the top on the tower, hanging hoist and the cross arm at the top of the tower system, the hoist is used to lift the lower beam pipe truss

      8、Slowly up straight the tower system by around 6 people, taking care not to push the column too hard, and then fix the pin into the hinge to make sure the tower system is up straight.

      9、 hook the hoist on the top section to lift up the beams after the tower system is erected.

     10、 slowly pull up the beam to around 2M height of the construction by 4 people.

     11、Install lighting and sound equipment on the beam;

     12、Pull the hoist together by 4 people to a predetermined height and stop

     13、Place a tube under the top section to act as a safeguard then the construction is completed.



       Methods and steps for construction:
       1Position the four bases roughly on the ground and adjust the lower legs so that they are in a horizontal plane
       2Insert the corner brace on the outside of the base at the four corners. Insert 2 corner brace at each corner, a total of 8 corner braces.
       3Fix the Hinge on the first one Meter truss of base with steel pin. Make sure that the direction of rotation of the hinge is consistent with that indicated in the figure
       4put the sleeve after assembled Hinge;
       5Connect the beams on the ground;
       6Connect the two ends of the beam to sleeves on both sides after the beam is assembled on the ground.
       7the tower systems lying flat with hinge, Assembling the top on the tower, hanging hoist and the cross arm at the top of the tower system, the hoist is used to lift the lower beam pipe truss
       8Slowly up straight the tower system by around 6 people, taking care not to push the column too hard, and then fix the pin into the hinge to make sure the tower system is up straight.
       9 hook the hoist on the top section to lift up the beams after the tower system is erected.
      10 slowly pull up the beam to around 2M height of the construction by 4 people.
      11Install lighting and sound equipment on the beam;
      12Pull the hoist together by 4 people to a predetermined height and stop
      13Place a tube under the top section to act as a safeguard then the construction is completed.